to-issues: slice wide refactors by expand–contract

Add a wide-refactor exception to the tracer-bullet rule: a single
mechanical change whose blast radius fans across the codebase can't
land as one green vertical slice. Seed "wide refactor" / "blast radius"
across the description, the explore step (detection), and the drafting
step (strategy), and give the expand–contract sequence in prose.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
Matt Pocock
2026-07-07 16:32:47 +01:00
co-authored by Claude Opus 4.8
parent 16a2a5cd00
commit a0329ba957
3 changed files with 14 additions and 1 deletions
+5 -1
View File
@@ -1,6 +1,6 @@
---
name: to-issues
description: Break a plan, spec, or PRD into independently-grabbable issues on the project issue tracker using tracer-bullet vertical slices.
description: Break a plan, spec, or PRD into independently-grabbable issues on the project issue tracker using tracer-bullet vertical slices — and slice wide mechanical refactors by expandcontract instead.
disable-model-invocation: true
---
@@ -22,6 +22,8 @@ If you have not already explored the codebase, do so to understand the current s
Look for opportunities to prefactor the code to make the implementation easier. "Make the change easy, then make the easy change."
Watch too for a **wide refactor** hiding in the plan — a single mechanical change whose **blast radius** fans across the whole codebase — because it slices differently from a tracer bullet (step 3).
### 3. Draft vertical slices
Break the plan into **tracer bullet** issues. Each issue is a thin vertical slice that cuts through ALL integration layers end-to-end, NOT a horizontal slice of one layer.
@@ -34,6 +36,8 @@ Break the plan into **tracer bullet** issues. Each issue is a thin vertical slic
</vertical-slice-rules>
The **wide refactor** you spotted in step 2 is the exception to the tracer-bullet rule: because a single edit breaks thousands of call sites at once, no one slice can land green. Don't force it into a tracer bullet — sequence it as **expandcontract**. First expand: add the new form beside the old so nothing breaks. Then migrate the call sites over in batches sized by blast radius (per package, per directory), each batch its own issue blocked by the expand, keeping CI green batch to batch because the old form still exists. Finally contract: delete the old form once no caller remains, in an issue blocked by every migrate batch. When even the batches can't stay green alone, keep the sequence but let them share an integration branch that all block a final integrate-and-verify issue — green is promised only there.
### 4. Quiz the user
Present the proposed breakdown as a numbered list. For each slice, show: