to-issues: split into Process + Reference tiers

Revert the description change and keep the wide-refactor material in
one place. Reshape the skill into a lean Process (steps) and a
Reference section holding the vertical-slice rules, the wide-refactor
expand–contract rules, and the issue body template as co-located
blocks the steps point to.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
Matt Pocock
2026-07-07 16:35:39 +01:00
co-authored by Claude Opus 4.8
parent a0329ba957
commit aa591116bf
3 changed files with 26 additions and 23 deletions
+1 -1
View File
@@ -34,7 +34,7 @@ Before slicing, `to-issues` looks for prefactoring — "make the change easy, th
## The wide-refactor exception
One shape breaks the tracer-bullet rule: a **wide refactor** — a single mechanical change (rename a column, retype a shared symbol) whose **blast radius** fans across the whole codebase, so one edit breaks thousands of call sites at once and no vertical slice can land green. `to-issues` spots this while exploring and slices it as **expandcontract** instead: expand (add the new form beside the old so nothing breaks), migrate (move call sites over in batches sized by blast radius, one issue per batch, CI green throughout because the old form still exists), then contract (delete the old form once no caller remains). When even the batches can't stay green alone, they share an integration branch that all block a final integrate-and-verify issue, and green is promised only there.
One shape breaks the tracer-bullet rule: a **wide refactor** — a single mechanical change (rename a column, retype a shared symbol) whose **blast radius** fans across the whole codebase, so one edit breaks thousands of call sites at once and no vertical slice can land green. `to-issues` slices it as **expandcontract** instead: expand (add the new form beside the old so nothing breaks), migrate (move call sites over in batches sized by blast radius, one issue per batch, CI green throughout because the old form still exists), then contract (delete the old form once no caller remains). When even the batches can't stay green alone, they share an integration branch that all block a final integrate-and-verify issue, and green is promised only there.
## Where it fits